20 Day Street Construction

Construction continues on the 3 story building

Construction continues on the 3 story building

Snow lightly covers the ground as construction continues

Snow lightly covers the ground as construction continues

Starting to dry in the 3 story building

Starting to dry in the 3 story building

Construction continues on the 3 story building

Construction continues on the 3 story building.

Construction continues inside the building

Construction continues inside the building

Sheetrock stacked to the side as workers continue construction inside the building

Sheetrock stacked to the side as workers continue construction inside the building

A construction worker preparing to install ducting work

A construction worker preparing to install ducting work

Outside light filters in through the widows of the construction site

Outside light filters in through the widows of the construction site

Construction workers on ladders continue their work

Construction workers on ladders continue their work

Construction continues outside the building

Construction continues outside the building

Outside light filters in through the widows of the construction site

Outside light filters in through the widows of the construction site

PVC pipes running the length of the hallway ceiling before the walls are dried in

PVC pipes running the length of the hallway ceiling before the walls are dried in

Outside light filters in through the widows of the construction site

Outside light filters in through the widows of the construction site

Construction worker, holding a ladder, looks up at a light

Construction worker, holding a ladder, looks up at a light

Construction on the roof of the building

Construction on the roof of the building

Construction continues on the 3 story building

Construction continues on the 3 story building

Construction continues on the 3 story building

Construction continues on the 3 story building

Construction on the top story continues

Construction on the top story continues

A playground in the middle of a courtyard with the 20 Day St building construction continuing in the background

A playground in the middle of a courtyard with the 20 Day St building construction continuing in the background

Bricks being set in concrete

Bricks being set in concrete

Workers use heavy machines to fill the bricked area with concrete

Workers use heavy machines to fill the bricked area with concrete

A worker continues construction on the outside of the building

A worker continues construction on the outside of the building

Building materials being stored in the parking garage

Building materials being stored in the parking garage

Construction continues, rolls of wire neatly piled

Construction continues, rolls of wire neatly piled

Outside light filters in through the widows of the construction site

Outside light filters in through the widows of the construction site

Construction continues inside the building, work lights are strung down the hallway

Construction continues inside the building, work lights are strung down the hallway

Construction continues inside the building, work lights are strung down the hallway

Construction continues inside the building, work lights are strung down the hallway

Sheetrock stacked up as workers prepare to dry in the rooms

Sheetrock stacked up as workers prepare to dry in the rooms

A smaller stack of sheetrock stacked up, workers have finished drying in this room

A smaller stack of sheetrock stacked up, workers have finished drying in this room

Outside light filters in through the widows of the construction site

Outside light filters in through the widows of the construction site

Construction outside the building continues, scaffolding is on the right side

Construction outside the building continues, scaffolding is on the right side

Construction outside the building continues

Construction outside the building continues

Construction outside the building continues

Construction outside the building continues

Construction outside the building continues, scaffolding reaching up to the 3rd story

Construction outside the building continues, scaffolding reaching up to the 3rd story

Construction outside the building continues, scaffolding reaching up to the 3rd story

Construction outside the building continues, scaffolding reaching up to the 3rd story

Workers continue construction on the outside of the building

Workers continue construction on the outside of the building

Large flat bed truck dropping off more sheetrock

Large flat bed truck dropping off more sheetrock

Workers continue construction on the outside of the building

Workers continue construction on the outside of the building

Red and black pipes with pressure gauges

Red and black pipes with pressure gauges

Construction continues inside the building

Construction continues inside the building

Workers begin to put the white and blue siding on the outside of the building

Workers begin to put the white and blue siding on the outside of the building

Workers continue to put the white and blue siding on the outside of the building

Workers continue to put the white and blue siding on the outside of the building

Workers continue to put the white and blue siding on the outside of the building and move on to the next side of the building

Workers continue to put the white and blue siding on the outside of the building and move on to the next side of the building

Workers continue to put the white and blue siding on the outside of the building and move on to the next side of the building

Workers continue to put the white and blue siding on the outside of the building and move on to the next side of the building

Workers continue to put the white and blue siding on the outside of the building and move on to the next side of the building

Workers continue to put the white and blue siding on the outside of the building and move on to the next side of the building

Workers continue to put the white and blue siding on the outside of the building and move on to the next side of the building

Workers continue to put the siding on the outside of the building and move on to the next side of the building

Workers have completed the siding on 2 sides of the building

Workers have completed the siding on 2 sides of the building

Workers continue to put siding on the building using scissor lift

Workers continue to put siding on the building using scissor lift

Workers continue to put siding on the building

Workers continue to put siding on the building

Workers on scaffolding

Workers on scaffolding

Workers on scaffolding continue construction on the outside of the building

Workers on scaffolding continue construction on the outside of the building

Construction outside the building continues, scaffolding reaching up to the 3rd story

Construction outside the building continues, scaffolding reaching up to the 3rd story

Siding of building from street view

Siding of building from street view

Siding of building almost complete

Siding of building almost complete

Boxes of materials stacked in the middle of the room

Boxes of materials stacked in the middle of the room

Kitchen cabinets stacked in the middle of the room

Kitchen cabinets stacked in the middle of the room

Kitchen cabinets are being installed

Kitchen cabinets are being installed

Materials stacked in the middle of the room as construction continues inside the building

Materials stacked in the middle of the room as construction continues inside the building

Metal pipes stacked in front of an electrical panel

Metal pipes stacked in front of an electrical panel

Construction continues inside the building; workers get ready to lay down flooring

Construction continues inside the building; workers get ready to lay down flooring

Black wiring all comes together

Black wiring all comes together

Construction continues inside the building, materials stacked in the middle of the room

Construction continues inside the building, materials stacked in the middle of the room

Construction continues inside the building

Construction continues inside the building

Construction materials stacked together

Construction materials stacked together

Construction continues inside, insulation has been put up in the hallway

Construction continues inside, insulation has been put up in the hallway

Construction continues inside, the hallway has been painted

Construction continues inside, the hallway has been painted

A stand up shower being installed

A stand up shower being installed

Freshly sodded playground with construction on the building happening in the background

Freshly sodded playground with construction on the building happening in the background

Kitchen cabinets have been installed, the flooring is being prepared to go down

Kitchen cabinets have been installed, the flooring is being prepared to go down

Kohler HVAC Unit

Kohler HVAC Unit

4 construction workers walking along a dirt road, past the freshly sided building

4 construction workers walking along a dirt road, past the freshly sided building