Washington Village Construction: 13 Day Street

 Construction is underway at 13 Day Street location

Construction is underway at 13 Day Street location

 A third story is being constructed

A third story is being constructed

 Walls are starting to go up inside

Walls are starting to go up inside

 Walls are starting to go up inside

Walls are starting to go up inside

 Materials are stacked in the corner, construction inside the building is underway

Materials are stacked in the corner, construction inside the building is underway

 3rd story is construction is underway

3rd story is construction is underway

 Scissor lift is being used to reach the top floor

Scissor lift is being used to reach the top floor

 Construction continues outside of the building

Construction continues outside of the building

 A construction worker uses a hammer to put rafters into place

A construction worker uses a hammer to put rafters into place

 Two construction workers discussing building plans

Two construction workers discussing building plans

 Wall studs are in place inside the building

Wall studs are in place inside the building

 The outside sheathing is completed

The outside sheathing is completed

 A forklift drops off a load of wood

A forklift drops off a load of wood

 The outside sheathing is completed

The outside sheathing is completed

 Heavy equipment to the left and stacks of bricks to the right

Heavy equipment to the left and stacks of bricks to the right

 The roofing has been laid and the guttering is being started

The roofing has been laid and the guttering is being started

 A roller has packed down all the dirt

A roller has packed down all the dirt

 Plastic is going up in the windows

Plastic is going up in the windows

 Windows are stacked inside, ready to be installed

Windows are stacked inside, ready to be installed

 The second layer of sheathing is going up on the outside of the building

The second layer of sheathing is going up on the outside of the building

 The second layer of sheathing is almost complete on the outside of the building

The second layer of sheathing is almost complete on the outside of the building

 Workers start to put up siding on the outside of the building

Workers start to put up siding on the outside of the building

 Siding is going up on the outside of the building

Siding is going up on the outside of the building

 Workers put up siding on the outside of the building

Workers put up siding on the outside of the building

 Workers put up siding on the outside of the building

Workers put up siding on the outside of the building

 Workers put up siding on the outside of the building and lower story windows are being installed

Workers put up siding on the outside of the building and lower story windows are being installed

 Construction continues at the 13 Day Street location

Construction continues at the 13 Day Street location

 Workers put up siding on the outside of the building and upper story windows are being installed

Workers put up siding on the outside of the building and upper story windows are being installed

 A worker operates a saw as others continue to put up siding

A worker operates a saw as others continue to put up siding

 Construction is still underway at 13 Day Street location

Construction is still underway at 13 Day Street location

 Workers are putting siding up on the top story of the building

Workers are putting siding up on the top story of the building

 White and green siding is going up on the outside of the building

White and green siding is going up on the outside of the building

 The siding and all the windows have been installed on this side of the building

The siding and all the windows have been installed on this side of the building

 The siding and all the windows have been installed on this side of the building, brick walkways are being laid

The siding and all the windows have been installed on this side of the building, brick walkways are being laid

 Workers continue to put up siding on the outside of the building

Workers continue to put up siding on the outside of the building

 White and green siding is going up on the outside of the building

White and green siding is going up on the outside of the building

 Insulation is being put up inside the building

Insulation is being put up inside the building

 Insulation is being put up inside the building

Insulation is being put up inside the building

 Construction workers are busy installing lines

Construction workers are busy installing lines