Washington Village Construction: 20 Day Street

Workers are pouring an elevator shaft

Workers are pouring an elevator shaft

The elevator shaft is completed

The elevator shaft is completed

The elevator shaft is completed, foundation walls are starting to go up

The elevator shaft is completed, foundation walls are starting to go up

Elevator shaft and support columns done

Elevator shaft and support columns done

Workers installing piping

Workers installing piping

The foundation wall and support columns are dry

The foundation wall and support columns are dry

Steel beams are being lifted into place

Steel beams are being lifted into place

Wall studs are going up inside the building

Wall studs are going up inside the building

A crane lifts steel beams into place

A crane lifts steel beams into place

Crane used for steel work

Crane used for steel work

Workers are laying concrete bricks

Workers are laying concrete bricks

Steel decking is being constructed

Steel decking is being constructed

Steel decking is being constructed

Steel decking is being constructed

A steel structure is going up

A steel structure is going up

Steel decking is being constructed

Steel decking is being constructed

Concrete has been poured and is drying

Concrete has been poured and is drying 

Concrete has been poured and is drying

Concrete has been poured and is drying

Steel decking has been constructed

Steel decking has been constructed

Workers begin to cover the steal decking

Workers begin to cover the steal decking

A string of work lights running along the ground under the steal decking

A string of work lights running along the ground under the steal decking

Wood material is stacked and ready for construction

Wood material is stacked and ready for construction

A worker prepares to pour a concrete floor

A worker prepares to pour a concrete floor

Steel rebar crisscrosses the ground in preparation of concrete being poured

Steel rebar crisscrosses the ground in preparation of concrete being poured

The wooden structure is starting to go up

The wooden structure is starting to go up

Wood material is stacked and ready for building

Wood material is stacked and ready for building

Wall studs are starting to go up

Wall studs are starting to go up

Workers prepare to stand a wall up

Workers prepare to stand a wall up

A concrete floor has been poured around the support columns

A concrete floor has been poured around the support columns

Walls are going up at the 20 Day Street location

Walls are going up at the 20 Day Street location

Wood material is stacked and ready for building

Wood material is stacked and ready for building

GE switchboards arriving on the back of a flatbed truck

GE switchboards arriving on the back of a flatbed truck

Wood material is stacked around, second story walls are starting to go up

Wood material is stacked around, second story walls are starting to go up

Everyone gathers together in their hardhats and construction vests

Everyone gathers together in their hardhats and construction vests

Construction continues at 20 Day Street

Construction continues at 20 Day Street

The building footprint is being created

The building footprint is being created

Wall studs have gone up and hallways are being constructed

Wall studs have gone up and hallways are being constructed

The second story outside walls are being constructed

The second story outside walls are being constructed

The second story outside walls are being constructed

The second story outside walls are being constructed

Second story walls are underway

Second story walls are underway

Construction is underway at 20 Day Street

Construction is underway at 20 Day Street

Second story outside walls are being constructed

Second story outside walls are being constructed

The second story outside walls are almost complete

The second story outside walls are almost complete

The second story outside walls are almost complete

The second story outside walls are almost complete

The second story outside walls are almost complete

The second story outside walls are almost complete

Third story walls start to go up

Third story walls start to go up

Wall studs have gone up and hallways are being constructed

Wall studs have gone up and hallways are being constructed

Wall studs have gone up and rooms are being constructed

Wall studs have gone up and rooms are being constructed

Third story walls are going up

Third story walls are going up

A worker uses a lift to install the sheathing to the outside of the building

A worker uses a lift to install the sheathing to the outside of the building

A worker uses a lift to install the sheathing to the outside of the building

A worker uses a lift to install the sheathing to the outside of the building

A worker uses a lift to install the sheathing to the outside of the building

A worker uses a lift to install the sheathing to the outside of the building

The third story is under construction

The third story is under construction

A worker uses a scissor lift to install the sheathing on the outside of the building

A worker uses a scissor lift to install the sheathing on the outside of the building

The third story walls are up on this side of the building

The third story walls are up on this side of the building