Washington Village Construction: 20 Day Street
Workers are pouring an elevator shaft
The elevator shaft is completed
The elevator shaft is completed, foundation walls are starting to go up
Elevator shaft and support columns done
Workers installing piping
The foundation wall and support columns are dry
Steel beams are being lifted into place
Wall studs are going up inside the building
A crane lifts steel beams into place
Crane used for steel work
Workers are laying concrete bricks
Steel decking is being constructed
Steel decking is being constructed
A steel structure is going up
Steel decking is being constructed
Concrete has been poured and is drying
Concrete has been poured and is drying
Steel decking has been constructed
Workers begin to cover the steal decking
A string of work lights running along the ground under the steal decking
Wood material is stacked and ready for construction
A worker prepares to pour a concrete floor
Steel rebar crisscrosses the ground in preparation of concrete being poured
The wooden structure is starting to go up
Wood material is stacked and ready for building
Wall studs are starting to go up
Workers prepare to stand a wall up
A concrete floor has been poured around the support columns
Walls are going up at the 20 Day Street location
Wood material is stacked and ready for building
GE switchboards arriving on the back of a flatbed truck
Wood material is stacked around, second story walls are starting to go up
Everyone gathers together in their hardhats and construction vests
Construction continues at 20 Day Street
The building footprint is being created
Wall studs have gone up and hallways are being constructed
The second story outside walls are being constructed
The second story outside walls are being constructed
Second story walls are underway
Construction is underway at 20 Day Street
Second story outside walls are being constructed
The second story outside walls are almost complete
The second story outside walls are almost complete
The second story outside walls are almost complete
Third story walls start to go up
Wall studs have gone up and hallways are being constructed
Wall studs have gone up and rooms are being constructed
Third story walls are going up
A worker uses a lift to install the sheathing to the outside of the building
A worker uses a lift to install the sheathing to the outside of the building
A worker uses a lift to install the sheathing to the outside of the building
The third story is under construction
A worker uses a scissor lift to install the sheathing on the outside of the building
The third story walls are up on this side of the building